Heating and cooling of the complex is supplied through the centeral plant room located on the 2nd floor by means of two steel boilers and two Hitachi compression chillers that are made in Japan. ceiling fan coil units are installed in all suites to provide fresh air and fresh air transfer line is provided in all staircases.